RAJASTHAN ELECTRICITY REGULATORY COMMISSION

 

GENERATION OF ELECTRICITY REGULATIONS

 

 

No. RERC/Secy./Regulation/                                                 Date:

 

In exercise of powers conferred on it by Section-57   read with Section 9 and 59 of the Rajasthan Power Sector Reforms Act, 1999, (State Act No.23 of 1999), section 44 of the Electricity (Supply) Act 1948, and all powers enabling it in this behalf, the Rajasthan Electricity Regulatory Commission, hereby makes the following regulations namely:  

 

1.         Short Title, Commencement and Scope:          

(1) These Regulations may be called the “ Rajasthan Electricity Regulatory Commission (Generation of Electricity) Regulations, 2002”.

 

(2) These regulations shall come into force from the date of their publication in the Official Gazette.

 

2.           Definitions

In these regulations, the words or expressions shall bear the same meaning as in the Rajasthan Power Sector Reforms Act 1999 and Rajasthan Electricity Regulatory Commission (Conduct of Business) Regulations, 2000.

3.           Consent of the Commission

         

          (1) A person, required to take previous consent under section 44 of the Electricity (Supply) Act, 1948 for establishing or acquiring a new generating station or for extending or replacing any major unit in a generating station, shall do so with prior consent of the Commission;

        Provided that no such consent shall be required if the installed capacity of the generating station is 250 kW or less.   

        Provided further that a generating company not required to take previous consent under Section 44 of the Electricity (Supply) Act 1948 shall be required to furnish copy of Memorandum and Articles of Association, area of activity specified by the State Government under Section 15A & 18A and copy of public notifications under Section 28 & 29 of the Electricity (Supply) Act 1948.

   (2) No such consent shall be required in respect of generating stations in existence on the date of coming into force of these regulations.

 

  (3) No person shall permanently close down an existing generating station/plant with an installed capacity of more than 250 kW without previous consent of the Commission.

 

  4.      Furnishing of Information

 

(1) Information in Form I shall be furnished to the Commission in respect of all generating stations with an installed capacity of 125 kW or more whether commissioned before or after coming into force of these regulations. Information in Form I shall be furnished for the year ending March 31, by April 30 ever year.

(2) All generating stations shall maintain logbook in the form prescribed by the Commission.

 

 5.        Procedure for grant of consent

 

(1) A petition for grant of consent shall be submitted to the Commission in the prescribed form as per Form ‘A’, ‘B’ or ‘C’ in six copies. The petition shall be accompanied with a fee of Rs. 5,000.00 for generating stations up to 25 MW and Rs 10000.00 for generating stations more than 25 MW

 

(2) Where installed rated capacity of any generating station exceeds or is likely to exceed 25 MW, the Commission shall consult the Central Electricity Authority before giving consent. Hence applicant shall follow guidelines issued by the Central Electricity Authority. A feasibility report shall be submitted with the petition.

 

(3) In case one or more units of the generating station is to run in parallel with the power system of the transmission or distribution licensee, acceptance of the licensee concerned shall be obtained by the generator and appended with the petition. In case an agreement to run the generating station in parallel is entered into subsequently, the Commission shall be notified of this arrangement within seven days of execution of such agreement.

 

6.     Compliance with rules and regulations

(1)       All generating stations will abide by the Safety Code and other good practices. A generating station running in parallel with the grid will in addition abide by the Grid Code, Distribution Code, Load Despatch and System Operations Code, Metering Code and other codes and regulations as laid down from time to time.

(2)             No generating station running in parallel with the grid shall be entitled to any compensation in the event of grid failure.

 

7.         Sale or wheeling of energy

       Terms and conditions of sale of electricity to transmission or distribution licensee or for wheeling of energy on their system or sale of electricity to consumers shall be as mutually agreed by them except that the tariff for sale of electricity to consumers or for transmission of electricity shall be as determined by the Commission. 

 

8.       Environmental clearances

The generating station shall abide by the emission standards set up by the Central/State Governments.  The generator will obtain and keep valid all the required environmental and pollution clearances from the appropriate authority.

 

        9.      Contravention of regulations

           Notwithstanding any other action that Commission may take for contravention of any provision of these regulations, the Commission may, after issuing a show cause notice to the person concerned withdraw the consent granted under these regulations.   

 

By order of the Commission

 

 

 

(P.Dayal)

Secretary

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Form A

 

Application Form for Grant of

CONSENT under Rajasthan Electricity Regulatory Commission

(Generation of Electricity) Regulations 2002. (Upto 1 M.W. Capacity)

 

 

 

1.

Name & address of the applicant

2.

Whether registered under Companies Act?

If yes a copy of Memorandum & Articles of

Association be provided/enclosed.

3.

Details of existing connection

taken from VVNL’s  (If any)

(i) Name of the connection

(ii) Connected load/contract demand

4.

Place a& address where

Generating sets shall be installed.

5.

Reasons for installing the proposed

Capacity of generating set(s) indicating

Whether it is stand by or will run regularly.

6.

Details of proposed generating set(s)

i) Type       ii) Fuel         iii) Capacity

7.

Details of generating set(s) already installed (if any)

 

 

S.No.

 

 

(1)

Capacity of set(s)

Specification of set(s)

 

 

(4)

 

Date of installation

 

 

(5)

Rated

 

(2)

Derated

 

(3)

 

 

 

 

 

 

 

Encl: Undertaking

 

Place:                                                                                                Signature:

Date:                                                                                                 Name:

                                                                                                            Designation:

 

 

 

Form ‘B’

Application Form for Grant of

CONSENT under Rajasthan Electricity Regulatory Commission

(Generation of Electricity) Regulations 2002. (Above 1 M.W. & Upto 25

 MW Capacity)

 

1.

Name & address of the applicant

2.

Whether registered under Companies Act?

If yes a copy of Memorandum & Articles of

Association be provided/enclosed.

3.

Whether the generating station/

CPP is required for existing or new

Proposed industry or sale to

Licensee or consumer

4.

Type of Industry

5.

Location

6.

Details of existing connection’s

taken from VVNL’s (If any)

(i) Name of the connection

(ii) Connected load/contract demand

(iii) Date of release of connection

7.

Present & future power demand of

the industry from Distribution Licensee.

8.

Type of proposed plant

(a)  Coal/Oil/Gas Plant

(b)  Co-generation plant

(c)   Hydro

(d)  Any Other

9.

Capacity of proposed plant (MW)

10.

Fuel to be used.

11.

Total surplus power, over and above its own requirement.

(a)  How is it proposed to utilize the surplus power?

(b)  Do you propose to sell the excess power to grid? Yes/No

(c)   If yes, whether agreement with VVNL/Distribution Licensee has been finalised and at what tariff.

12.

Justification for setting up of CPP/generating set.

13.

Whether manufacturing process requires un-interrupted power supply?       Yes/No.

14.

Annual generation Mwh envisaged ( in M.U.).

15.

Total annual energy requirement of the applicant  (in M.U.)

16.

Details of generating set(s) already installed (if any)

 

 

 

S.No.

 

 

(1)

Capacity of set(s)

Specification of set(s)

 

 

(4)

 

Date of installation

 

 

(5)

Rated

 

(2)

Derated

 

(3)

 

 

 

 

 

 

 

Encl: Undertaking

 

Place:                                                                                                Signature:

Date:                                                                                                 Name:

                                                                                                            Designation:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FORM ‘C’

Application Form for Grant of

CONSENT under Rajasthan Electricity Regulatory Commission (Generation of Electricity) Regulations 2002. (Above 25 MW Capacity)

 

1. Name and address of the applicant

2. Whether registered under Companies Act? If yes, a copy of Memorandum & Articles of Association be provided/ enclosed

3. Whether the Generating Station/

 CPP is required for existing    or new proposed industry

4. Type of Industry

5. Location

6. Details of existing connection(s) taken from VVNL if any

(i) Name of the Connection

(ii) Connected load/ contract demand

(iii) Date of release of connection.

7. Source of Supply of Fuel & its tie up

8. Requirement of Fuel (MT)

9. Transportation of Fuel

10. Zero Date

11. Gestation Period (months)

12. Year of Commissioning

13. Details of Estimated Cost Incl. IDC

      - Whether environment clearance obtained?

      - If yes, copy of the same may be enclosed.

14. Cost per MW

15. Generation Cost per Unit at Bus bar

     a) In 1st year

     b) Levellised tariff

     c) VVNL supply

16. Present & Future Power Demand of the industry from VVNL/Distribution Licencee.

17. Type of proposed plant

     (a) Coal/ Oil/ Gas fired

     (b) Co-generation plant

     (c) Hydro

     (d) Any Other

18. Capacity of proposed plant (MW)

       Total capacity selected, keeping in view the

      (a) Standard Size

      (b) Margin

      (c) Sale to grid

19. Fuel to be used

20. Total Surplus power, over and above its own requirement.

      (a) How is it proposed to utilize the surplus power?

      (b) Do you propose to sell the excess power to grid?

            Yes/ No

      (c) If yes, whether agreement with VVNL/ Distribution Licencee has been finalised and at what tariff?

21. Justification for setting up of Generating Station/ CPP.

22. Whether manufacturing process requires un-interrupted power supply? Yes/ No

    

23. Whether the industry requires stringent tolerance in voltage & frequency?

      a) If yes, why?

      b) Whether VVNL/ Licencee is able to maintain these parameters?

      c) If not supporting document from concerned Licencee.

24. Whether Generating Station/ Captive plant is able to generate power at a price lower than the tariff charged by VVNL/ Distribution Licencee?

      If yes furnish detailed calculation of cost of generation.

25. If the capacity of the generating plant is higher than the contracted       demand, please state reasons for such additional requirement.

 26. If generating plant is proposed to be run in parallel with Grid

     (a) Arrangements proposed for prevention of back feeding to Transco/ VVNL system for safety of their staff.

     (b) Voltage of interconnection with system;
     (c) Point to interconnection with system;
     (d) Arrangements for synchronization; and

     (e) Estimated cost of proposed interconnection
 27. Annual generation in Mwh envisaged (in Million Units):

28.  Total annual energy requirement of the applicant (in million units):

29. New Project / Expansion of the existing generating plant (In case of phased programme of installation, year to year information be furnished):

30. Salient features relating to Technical details of Generator, Prime Mover, Exciter, Automatic Voltage Regulation, Protection, (To be separately attached):

31. Planned peak generation (in MW):

    

 

 

32. Any other relevant information for justification of the proposal.

 

Date:

Signature

Place:                                                      Name of the applicant and

designation

 

Enclosures: Following documents are to be enclosed with the               application.

(1) Demand draft of Rs----------------- towards processing fees 

(2) Site map indicating location.

(3) Technical particulars of Generating units.

(4) Single line diagram (details of protection and interlocks should also be  shown).

(5) NOC / Renewals of NOC (if any) for CPP issued by Rajasthan Pollution Control Board

(6) Copy of approval from VVNL, if any

(7) Details of calculation of cost of generation

     a. First Year
     b. Levelised

(8) Consent from RVPN/VVNL for parallel operation of the plant (if any)

(9) Memorandum & Articles of Association of the Company. (For companies registered under companies Act)

(!0)Undertaking

(11) Any other details (considered necessary by applicant).

 

 

Signature of the Applicant

 

 

 

 

 

 

U N D E R T A K I N G

 

I/We under take to abide by the following conditions:

 

1.                  That I/We shall maintain the Log Book in the form prescribed by the Commission.

2.                  That the supply arrangements fro the Generating Set(s) shall be got checked and approved by the office of VVNL/Licensee.

3.                  That I/We shall neither sell the energy generated by me/us nor shall supply the power/energy so generated even free of cost to others.

4.                  That the generating sets will not in any circumstances be in parallel with the power system of Licensee/VVNL.

5.                  That I/We shall operate the generating set(s) whenever called up to do so by the Commission or Licensee for giving suitable relief to the Licensee’s system by meeting the demand of other consumers also.

6.                  I/We shall not run the generating set(s) in case my/our supply is dis-connected by Licensee for any violation of the rules or non-payment of electrical dues.

7.                  That the permission accorded by the Commission does not absolved me/us from obtaining any other approval necessary like the approval of the Electrical Inspector to the State Government etc.

8.                  I/We shall install the Generating Set(s) within a period of __________ year(s) from the date of issue of sanction.

9.                  I/We shall send the monthly data of energy generation in the proforma prescribed by the Commission after commissioning of the generating set(s)to concerned authorities as directed by the Commission.

10.             I/We shall comply/ fulfill all the conditions stated above falling which the Commission will be free to withdraw this permission.

 

 

 

Place:                                                                                                Signature:

Date:                                                                                                 Name:

                                                                                                            Designation:

 

 

 

Form 1

 

Monthly/annual data of generation

 

 

Period/month ………………

 

 

1-         Name of generating company/consent holder & address

2-            Location

3-            District

4-            Generation capacity installed

5-            Generation capacity in operation

Generation Unit

Type (Steam/diesel/

gas/hydro/wind)

Rated capacity, KW

Derated capacity  since date KW

Date of commissioning

I-

 

 

 

 

II-

 

 

 

 

 

6-         Peak Active Generation, KW

7-         Peak Reactive Generation, KVAr

8-         Peak Apparent Generation, KVA

9-         Gross Generation during the period, KWh

10-            Auxiliary Consumption during the period, KWh

11-      Net generation during the month/year, KWh

12-            Reactive energy generation during the period, KVArh

13-      Fuel consumption, (separately in respect of each fuel)

(i)                …………

(ii)               ………..

(iii)             ………..

 

 

 

 

 

 

 

 

 

 

 

 


Page1/2

PROFORMA OF LOG BOOK

 

 

 

1-         Name of Generating company/consent holder

2-         Date

3-            Rated capacity, KW

4-            Derated capacity, KW

5-            Generation voltage, KV

6-         Other salient specifications, if any

7-         Date of commissioning

8                   (a)-  Fuel consumption for the day

 

 

Unit No.1

Unit No.2

Initial reding

Final reading

Consumption in lit/Kg.#

Initial reading

Final Reading

Consumption in lit/Kg.

 

8 (b)- Units generated for the day

 

Unit No.1

Unit No.2

Initial reading

Final reading

Gross/net generation/

consumption KWh

Initial reading

Final Reading

Gross/net generation/

consumption KWh

 

9-         Units generated, etc.

(i)                Generation, KWh

(ii)               Auxiliary consumption, KWh

(iii)             Units sent out, KWh

(iv)           Reactive energy generation, KVArh

Page 2/2

 

Hrs.

Voltage

Ampere

Frequency

Power Factor

KW

KVAr

KWh meter reading

KVARh meter reading

Remarks

1.00 Hrs.

Unit-I

Unit-II

 

 

 

 

 

 

 

 

 

2.00 Hrs.

Unit-I

Unit-II

……

…….